The Capacity Management Operations and Maintenance (CMOM) repair replacement project is underway as a continuation of the Year 1 closed circuit television (CCTV) inspection work.
Link to pageThe project work extends from West Chester all the way to India Street and requires daily traffic control for full road closures. Roadways will be reopened nightly.
Link to pageThe Town is implementing a sewer project that will include the installation of a new sewer force main that will connect the Sea Street Pump Station (SSPS) to the Surfside Wastewater Treatment Facility (WWTF).
Link to pageDuring the spring and fall of 2022, the Town of Nantucket will begin the installation of new sewer and water main infrastructure along South Shore Rd.
Link to pageThe purpose of the Surfside Road Area Sewer System Improvements project is to provide adequate capacity for the sewer system expansions for the needs areas identified in the 2014 Comprehensive Wastewater Management Plan (CWMP) Update.